Lighthouse has a new layout. Prefer the old one? Return to the old layout, and switch back any time from the link at the top of each page.

Skeleton code is ready to be committed to.

∞ days late

Progress

 

% Complete

44%

Tickets Left

5

A loose skeleton of code, perhaps some unit tests are available for people to see and understand.

This will take longer than anticapated, mainly because the skeleton will be very flushed out.

Expected Jan 19th, 2009